9.Slide white pipe assembly through sleeve of tarp (10) and snap it into opening on lower U-pipe (7). See FIG. A.

NOTE: Locking pins on pipe (4) MUST snap into holes of U-pipe (7).

10

7

4

12

4

FIG A.

10

4

7

10.Snap white pipe assembly into opening in upper U-pipe (6).

NOTE: Locking pins on white pipe (4) MUST snap into holes of upper U-pipe (6).

10

4

 

 

 

 

 

 

 

6

 

 

9

07/03

P/N 211737A

 

 

Page 9
Image 9
Huffy Table-Top Basketball Game manual Snap white pipe assembly into opening in upper U-pipe