Hunter Fan Type installation manual Installing the Hanger Bracket, Left, Right

Models: Type

1 14
Download 14 pages 2.15 Kb
Page 5
Image 5
2 • Installing the Hanger Bracket

2 • Installing the Hanger Bracket

2-1. Drill two pilot holes into the wood support structure through the outermost holes in the outlet box. The pilot holes should be 9/64” in diameter.

Note: Your fan comes with four pre-installed neoprene noise isolators.

2-2. Thread the lead wires from the outlet box down through the hole in the middle of the hanger bracket.

2-3. Align the slotted holes in the hanger bracket with the pilot holes you drilled in the wood support structure. For proper alignment use slotted holes directly across from each other. If you are installing the fan on an ANGLED ceiling, be sure to orient the hanger bracket as shown in Illustration 2-3 (left or right view).

Note: The isolators should be flush against the ceiling.

2-4. Place a flat washer on each of the two 3” screws and pass the screws through the slotted holes in the hanger bracket into the pilot holes you drilled.

Tighten the screws into the 9/64” pilot holes; do not use lubricants on the screws. Do not over tighten.

Left Flat Washer

Isolator RIGHT

Hanger

Bracket

Steps 2-22-4

Large

Ceiling Peak

Ceiling Peak

or

Large

Opening

 

Opening

 

 

3” Screw

Left

Step 2-3 (Angled Ceiling Only)

RIGHT

5

45040-01 • 12/19/08 • Hunter Fan Company

Page 5
Image 5
Hunter Fan Type installation manual Installing the Hanger Bracket, Left, Right