Husqvarna 115 145727 6UPPER CHUTE INSTALLATION, Chute / Hood Installation, Leveling Mower Deck

Models: 525 88 56-01 966004001 115 145727

1 17
Download 17 pages 18.34 Kb
Page 9
Image 9
6UPPER CHUTE INSTALLATION

ASSEMBLY

6UPPER CHUTE INSTALLATION

NOTE: Depending on model, it may be necessary to drill a ¼" hole to move the upper chute latch nut.

1.Slide upper chute onto lower chute, lining up notches and channels. If latch on lower chute and latch nut on upper chute are aligned, skip to Step 3.

2.If upper chute latch nut is not aligned to the lower chute bungee, drill a ¼" hole 2½" from the lower edge of the upper chute and in alignment with the lower chute latch. Move latch nut and hardware to new hole placement.

3.Stretch bungee latch up onto acorn nut on upper chute to secure.

Drill hole placement, if necessary

7CHUTE / HOOD INSTALLATION

1.Push upper chute through the gasketed opening in the cover assembly.

2.Rotate chute so the chute opening is downwards toward the container bags.

 

Rotate upper chute to point

Hood Inlet

downwards towards bags

 

8 LEVELING MOWER DECK

Be sure deck is properly leveled for best mower performance. See your mower operator’s manual for instructions.

Before continuing to Step 7, locate the seal fastening kit (packed separately) and install the top cover grommet.

10

Page 9
Image 9
Husqvarna 115 145727, 966004001 manual 6UPPER CHUTE INSTALLATION, Chute / Hood Installation, Leveling Mower Deck, Assembly