Whenever possible, use all product before per-
forming maintenance. Product allowed to warm
above the operating temperature (22°F) may
freeze when restocked.
Removing Shelves
The MAXI-140 comes standard with one fixed
wire shelf (upper) with dividers for 16oz.
aluminum bottles and one removable flat wire
shelf (lower).
1. Disconnect the electrical power to the
Chill Chamber.
2. Lift out the lower shelf.
3. To remove upper shelf, remove the nearest
screw on the LH side and on the RH side.
Do NOT remove the other six shelf screws
unless required by local health code.
4. Pull the upper shelf OUT and then UP to
clear screws and remove from the unit.
5. Clean and sanitize the shelves and interior.
Dry completely before restoring power.
6. Reinstall the upper shelf. Make sure that
each shelf mounting slot engages with its
mounting screw.
7. Install the near-most LH side and RH side
screws into the upper shelf.
8. Place the lower shelf flush against the back
with the bottle rail toward the back of the
Chill Chamber to maintain proper air flow and
product temperature. The lower shelf must be
installed .
9. After cleaning or servicing the Chill
Chamber, reconnect the electrical power.
Cleaning under the Unit
Use a vacuum with a long wand attachment to
remove accumulated dust and debris from
under units with optional legs. Units without
optional legs are sealed at the base.
©2007 HUSSMANN CORPORATION �� BRIDGETON, MO 63044-2483 U.S.A.
U.S. &CANADA 1-800-504-4828 • WWW.CHILLCHAMBER.HUSSMANN.COM
11
P/N 31033596_B
01 June 2007
™
MAXI-140
™
MAXI-140
™
MAXI-140
™
MAXI-140
™
MAXI-140
™
Shelf Fasteners
Removable Lower Shelf
with Product Stop to Rear
Fixed Upper Shelf
Remove Front Screws Holding Upper Shelf