ÉÂÔ Installation Instructions

10.3 Log Off the MOSS-E

1. On

the3746-9x0

Menu

window,

clickFunction

, then clickExiton.

2.

On

theMOSS-E

View

window,

clickProgramon

.

3.

Click onLOG

OFF

MOSS-E

.

 

 

4.Close the front and rear doors of the controller expansion.

10.4Returning the Machine to the Customer

Inform the customer that the NNP backup is installed and operational.

11.0 Test Procedures

No test required.

12.0 Field Updating

None.

After Installation (Steps 13-15)

13.0 Field Updating

None.

14.0 Publications Update

None.

15.0 Parts Disposition

3746 PN 42L2445 FFBM 8 of 10