Manuals
/
IBM
/
Computer Equipment
/
Computer Accessories
IBM
X3950 M2
installation instructions
8u needed for 2-node system
Models:
X3950 M2
1
4
16
16
Download
16 pages
36.39 Kb
1
2
3
4
5
6
7
8
Install
Node Cable Setup
Page 4
Image 4
IBM System x
8u needed for
2-node
system
The length of the scalability cables requires that no empty
U-spaces
exist between the nodes.
4
Page 3
Page 5
Page 4
Image 4
Page 3
Page 5
Contents
IBM System
IBM System
Links to System Manuals
8u needed for 2-node system
Install slides into rack
Install nodes onto the slides
Install Enterprise Cable Management Arms onto nodes
Connect Scalability Cables to Scalability Ports
Install and Route Scalability Cables Recommended Method
Install and Route Scalability Cables- Recommended Method
Connect power and IO cables to system and route through CMA
Secure the cables in the CMA
Remove cable slack from CMA hanger brackets
Node Cable Setup
Verify Cabling
Feedback
Top
Page
Image
Contents