STEP 7 (See Diagram 7 & Cable Loop Diagram)

A.) Attach one 124” Cable (#60) to the lower opening on the Rear Vertical Beam (#38). Attach

a Pulley to the opening. Secure it with M10 x 2 3/8” Allen Bolt (#95), two Ø 1” Bushings (#85), and one M10 Aircraft Nut (#106).

B.) Draw the Cable underneath the Pulley to the open bracket on the Weight Glide Post (#34).

Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#93), two ¾” Washers (#89), and one M10 Aircraft Nut (#106).

C.) Draw the Cable around the Pulley then upward to the Double Floating Pulley Bracket previously installed in Step-5. Install a Pulley.

D.) Draw the Cable around the Pulley then downward to the open bracket on the back of Rear Vertical Beam. Install a Pulley then draw the Cable upward to the Single Floating Pulley Bracket (#47) installed in Step-6. Secure the end of the Cable to the bracket with one M10 x 1” Allen Bolt (#92), two ¾” Washers (#89), and one M10 Aircraft Nut (#106).

E.) Connect the Shiver Bar (#51) to the Cable with a Chain (#87) using two C-clips (#84).

F.) Check the tension of the Cables. If the Cables are too loose, adjust the tension by moving up the Pulley on the Double Floating Pulley Bracket (#46). If the Tension is too tight, then move down the Pulley.

18

Page 19
Image 19
Impex MD-MXM6 manual See Diagram 7 & Cable Loop Diagram