STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach one 124” Cable (#60) to the lower opening on the Rear Vertical Beam (#38). Attach
a Pulley to the opening. Secure it with M10 x 2 3/8” Allen Bolt (#95), two Ø 1” Bushings (#85), and one M10 Aircraft Nut (#106).
B.) Draw the Cable underneath the Pulley to the open bracket on the Weight Glide Post (#34).
Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#93), two ∅ ¾” Washers (#89), and one M10 Aircraft Nut (#106).
C.) Draw the Cable around the Pulley then upward to the Double Floating Pulley Bracket previously installed in
D.) Draw the Cable around the Pulley then downward to the open bracket on the back of Rear Vertical Beam. Install a Pulley then draw the Cable upward to the Single Floating Pulley Bracket (#47) installed in
E.) Connect the Shiver Bar (#51) to the Cable with a Chain (#87) using two
F.) Check the tension of the Cables. If the Cables are too loose, adjust the tension by moving up the Pulley on the Double Floating Pulley Bracket (#46). If the Tension is too tight, then move down the Pulley.
18