SP-CEIL-003
Projector Mount
INSTALLATION INSTRUCTIONS
qStep 1
Invert the projector and place it on a soft and flat surface.Locate the four (4) 6 (mm) mounting points found on the bottom of the projector (C). Align and secure the mounting bracket (B) using the six (6) 8 (mm) x 10 (mm) Phillip screws (A) (supplied).
Do not over tighten!See Figure 1qStep 2
Install the base box securely to the ceiling structure in accordance with proper commercial standards. Use (commercially available) suitable hardware depending on the installation requirements.
NOTE: If the (Optional)
(Refer to its Installation Instructions)
qStep 3
Install the two (2) conical spacers (J) and two (2) flat washers (K) two(2)hinge pin screws (L) loosely on both sides of the base box (H). Raise the projector with the mounting bracket attached and slip though the hinge pin slots openings on the bracket into the base box. Install the two (2) angle locking screws (I) adjust the angle, lock it, and then tighten the hinge pin screws (L).
See Figure 2
qStep 4
Check all the hardware for proper tightness and security. Do not over tighten hardware.