4 45532694_ed2
1.2 Change Pneumatic Clamps
Drawings/ Component lists:
Aut. Tool Changer DS Docking unit T2X-16-502-IR
DS-ATC complete T2X-16-500-IR/-505-IR
Aut. Tool Changer- (onboard lub.) DS Docking unit T2X-16-503-IR
DS complete T2X-16-501-IR
a) Follow step a) to e) in section 1.1. The docking station can be turned 180° and place back in the
same place.
Disconnect electric contacts and remove pneumatic hoses on clamp unit.
b) Unscrew the four screws (15 on T2X-16-502-IR/-503-IR) and remove the pneumatic clamp (10 on
T2X-16-502-IR/-503-IR).
Mount the new clamp. The two alignment pins (16) are used for guidance and the eight hexagonal
screws (15 on T2X-16-502-IR/-503-IR) are mounted back. Connect the air hoses. The accompanying
shims are important for the docking sequence functionality. Do not lose or mix the shim to the
corresponding clamp.
c) Connect the air hoses.
See “Doser” Maintenance Manual Form 45532660.
d) Refit the docking station as reverse of above.
e) Put the cover plate (9 on T2X-16-500-IR/-501-IR/-505-IR) back by fastening the three screws (14
on T2X-16-500-IR/-501-IR/-505-IR).