Existing Construction
| Level |
| Template |
| Tape |
Step One: | Step Two: |
Remove the grille from the | Determine the correct speaker |
speaker frame. | location. |
Kerf Line |
| |
Step Three:
Determine the
Step Four:
Cut the dry wall.
Step Seven:
Connect the speaker wires to the baffle assembly and install baffle assembly in frame.
Do not overtighten the baffle screws.
Step Five:
Place the mounting bracket on the speaker frame using the mounting guides (marked 3/8", 1/2", 5/8", and 3/4") corre- sponding to the thickness of the dry wall.
Step Eight:
Replace the metal grille.
Step Six:
Place the frame assembly in the wall.