![](/images/new-backgrounds/1320066/32006617x1.webp)
Assembly
Step 5
Start by attaching Cable (15) to Main Frame (1). See detail A below.
Insert cable into Pulley V location and then attach Pulley V to Main Frame (1) using one Bolt (36), two Washers (43), and one Nylon Locknut (42).
Note: Make sure cable is running through the groove of each pulley.
Note: All pulleys use the same hardware to attach to Main Frame (1). Attach Pulley W to Main Frame (1) and then run cable over top of the pulley. Run cable though slot in Main Frame (1) at Pulley X location.
Insert Pulley X into Main Frame (1), insure cable runs through bottom side of pulley. Run cable through Pulley Y location and then install Pulley Y onto Main Frame (1). Run cable through Pulley Z location and then install Pulley Z onto Main Frame (1). Last, thread cable end into the floating pulley of home gym unit.
Figure 5
Y
X
W
V
A
Note: Tighten all hardware securely.
E Type
Congratulations!button
You have completed the assembly of your new
Z