11

Determine vent path

Select the route that will provide the straightest and most
direct path outdoors.
Plan the installation to use the fewest number of elbows and
turns.
When using elbows or making turns, allow as much room as
possible.
Bend vent gradually to avoid kinking.
Use the fewest 90° turns possible.

Determine vent length and elbows needed for best

drying performance

Use the Vent system chart below to determine type of vent
material and hood combinations acceptable to use.
NOTE: Do not use vent runs longer than those specified in
the Vent system chart. Exhaust systems longer than those
specified will:
Shorten the life of the dryer.
Reduce performance, resulting in longer drying times and
increased energy usage.
The Vent system chart provides venting requirements that will
help to achieve the best drying performance.

Vent system chart

NOTE: Side and bottom exhaust installations have a 90º turn
inside the dryer. To determine maximum exhaust length, add one
90º turn to the chart.
InstallVentSystem
1. Install exhaust hood. Use caulking compound to seal exterior
wall opening around exhaust hood.
2. Connect vent to exhaust hood. Vent must fit inside exhaust
hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.
3. Run vent to dryer location. Use the straightest path possible.
See Determine vent path in Plan Vent System. Avoid 90º
turns. Use clamps to seal all joints. Do not use duct tape,
screws or other fastening devices that extend into the interior
of the vent to secure vent.
InstallLeveling Legs
1. To protect the floor, use a large flat piece of cardboard from
the dryer carton. Place cardboard under the entire back edge
of the dryer.
2. Firmly grasp the body of the dryer. Gently lay the dryer on the
cardboard. See illustration.
3. Examine the leveling legs. Find the diamond marking.
4. Screw the legs into the leg holes by hand. Use a wrench to
finish turning the legs until the diamond marking is no longer
visible.
5. Place a carton corner post from dryer packaging under each
of the 2 dryer back corners. Stand the dryer up. Slide the
dryer on the corner posts until it is close to its final location.
Leave enough room to connect the exhaust vent or gas line.

For mobile home use

Gas dryers must be securely fastened to the floor at the time of
installation.
Mobile home installations require a Mobile Home Installation Kit.
For more information, please ref erence the service numbers in
the Assistance or Service section of this manual.
Number of
90º turns
or elbows
Type o f
vent Box or
louvered
hoods
Angled
hoods
0 Rigid metal
Flexible metal 64 ft (20 m)
36 ft (11 m) 58 ft (17.7 m)
28 ft (8.5 m)
1 Rigid metal
Flexible metal 54 ft (16.5 m)
31 ft (9.4 m) 48 ft (14.6 m)
23 ft (7 m)
2 Rigid metal
Flexible metal 44 ft (13.4 m)
27 ft (8.2 m) 38 ft (11.6 m)
19 ft (5.8 m)
3 Rigid metal
Flexible metal 35 ft (10.7 m)
25 ft (7.6 m) 29 ft (8.8 m)
17 ft (5.2 m)
4 Rigid metal
Flexible metal 27 ft (8.2 m)
23 ft (7 m) 21 ft (6.4 m)
15 ft (4.6 m)
WARNING

ExcessiveWeightHazard

Usetwoormorepeopletomoveandinstalldryer.

Failuretodosocanresultinbackorotherinjury.