Note - Installation must conform with these
instructions and the installation instructions packaged with the GHR26 furnace.
Note - The overall dimensions of the GHR26 and the awkwardness of handling the GHR26 are increased once transitions are installed.
A - Return Air Transition installation.
Refer to figure 2,
1 - Lay GHR26 unit on its back (exposed internal parts facing up), (Figure 2 shows installed position.)
2 - Remove the three
3 - Cut two strips from roll of
4 - Install transition as shown.
B - Supply Air Transition Installation.
Refer to figure 2.
t - Remove the three
2 - Cut two strips from roll of
3 - Install transition as shown. C - Base Rails Installation,
Refer to figure 2
1 - Install base rails as shown in figure 2. D - Unit Installation
1 - Align unit with existing supply air plenum (coil
cabinet in air conditioning applications) and return air plenum, Make connections to unit.
2- Connect low voltage wiring as illustrated in GHR26 installation instructions.
Consult local codes for flexible connector installation restrictions on GHR26 furnace.
5- Connect venting as outlined in GHR26 installation instructions,
Note - Mufflers can not be used in GHR26 installation. Check existing venting for size (diameter and length). It should meet the specifications as outlined in GHR26 installation instructions. If a concentric vent is used for
6 - Connect heat exchanger condensate drain line as outlined in GHR26 unit installation instructions.
Note - Coil drain line must not be connected to
heat exchanger condensate drain line. ff lines were connected, debris from evaporator could affect heat exchanger operation.
7 - Continue with Unit
Note - See GHR26 installation instructions for heat
anticipation settings.
Page 3