16
8. Connect the battery wire connectors together.
9. Slide battery assembly completely into the UPS, reposition the large battery
door and replace the screws removed in step 3.
10. Reposition small battery door and replace the screws removed in step 2 to
lock top battery door closed.
11. Replace front bezel (cover) on UPS. Replace the securing flanges (for Rack
Tower procedures) and flange screws to secure bezel in place. For Tower
procedures, replace the two front rubber feet, stand unit upright, and replace
the top cover. Connect the UPS to the utility supply socket and turn on the
UPS by pressing the On button. The UPS is ready for normal operation.
12. Dispose of batteries in accordance with your local laws and regulation.