![Manual background](/images/new-backgrounds/187654/18765411x1.webp)
FIGURE 5
TOWER |
|
TOWER |
|
BRACE | 1/2 X 4” BOLT |
| (EXISTING) |
GUIDE
RODS
SHAFT
COLLARS
STEP 5:
• Place TOWER BRACE over the GUIDE RODS and securely fasten TOWER BRACE to TOWER using previously removed 1/2” X 4” BOLTS, 1/2”WASHERS, AND 1/2” NUTS as shown in FIGURE 5.
• Slide the SHAFT COLLARS to the top of the GUIDE RODS and SECURELY tighten the SHAFT COLLAR SET SCREWS .
FIGURE 6
STEP 6:
2 |
•Route threaded end of new CABLE (66710) (2) around pulleys in TOP BOOM, PULLEY BLOCK ASSEMBLY, and TOWER BRACE as shown in FIGURE 6.
•Retighten any loosened pulley connections.
1/2
1/2
1/2
1/2
1/2
1/2
0
1
2
3
4
5
6
6