13
STEP 7:
Insert the threaded end of the CABLE (21) where UPPERPULLEY (H) was located.
Lower the CABLE (21) down the long vertical tube that is in front of the gym until it can be retrieved near where the
LOWER PULLEY (M) was located. Carefully pull enough cable out to reach the ROLLER CARRIAGE(Q).
REINSTALLthe LOWER PULLEY using the previously removed M10 x 55mm SCREW (N), M10 WASHERS (O),
and M10 HEX NYLOCK NUT (P). Be sure that the CABLE(21) is properly routed around the PULLEY.
Bring the threaded end of the CABLE (21) up to the ROLLERCARRIAGE (Q) and thread the CABLE (21) into the
ROLLER CARRIAGE (Q). Do not tighten!
Assemble the MIDDLE UPPERPULLEY (13) by using two FULLPULLEY COVERS (44), one PULLEY RETAINER
(36), one M10 SOCKET HEAD NUT(34) and one M10 x 50mm HEX TENSIONSCREW. (38).
Feed the cable end with the small ball between the MIDDLE UPPERPULLEY BRACKET(S) and then through the
forward most hole in the MIDDLE BRACKET TUBE (3) above the HEAD PLATEPULLEY ASSEMBLY(19).
Take the CABLE(21) down and around the HEAD PLATEPULLEY (19)and back up through the MIDDLE BRACK-
ET TUBE (3) again, passing through the remaining access hole.
Feed the CABLE (21) around where the UPPER PULLEY(H) of the RIGHT TOWER (11) was located. Forward the
CABLE (21) through the TOP BRACKET TUBE (2) and out the access hole where the UPPER PULLEY(H) was
located.
REINSTALLUPPER PULLEY (H) using the previously removed M10 x 50mm SCREW (I), PULLEY RETAINER (J),
M10 SOCKET HEAD NUT(K), and PARTIALPULLEY COVER (L). Be sure that the CABLE (21)is properly routed
around the PULLEY.
Bring the CABLE (21) down to the ROLLER CARRIAGE (Q).
Feed the CABLE (21) through the two pulleys in the ROLLER CARRIAGE (Q) as shown..
Repeat Step 6 to route the cable through the LEFTTOWER (1).