Squat
Assembly Instructions
1.LOOSELY assemble the PLATFORM FRAME (1) to the TOWER (2) using four M10 X 130mm BOLTS (3), eight 3/8" SAE WASHERS (4) and four M10 NYLOCK NUTS (5) as shown.
2.LOOSELY assemble the CENTER BRACE (6) to the PLATFORM FRAME
(1)using two M10 X 90mm BOLTS (7), four 3/8" SAE WASHERS (4) and two M10 NYLOCK NUTS (5) as shown.
3.LOOSELY assemble the UPRIGHT (8) to the CENTER BRACE (6) using two M10 X 25mm BOLTS (9), two M10 X 90mm BOLTS (7), eight 3/8" SAE WASHERS (4) and four M10 NYLOCK NUTS (5)
LOOSELY assemble the UPPER BRACE (10) to the UPRIGHT (8) and TOWER (2) using two M10 X 25mm BOLTS (9), four 3/8" SAE WASHERS
(4)and two M10 NYLOCK NUTS (5) at the UPRIGHT and two M10 X 70mm BOLTS (11), four 3/8" SAE WASHERS (4) and two M10 NYLOCK NUTS (5) at the TOWER as shown.
4.Tighten all BOLTS and NUTS securely.
5.Install the PIVOT SHAFT (12), LONG SPACER (13), two BEARINGS (14) and two SHORT SPACERS (15) into the PIVOT HOUSING (A) of the WORKARM (16).
6.Assemble the WORKARM (16) to the UPRIGHT (8) using two M10 X 25mm BOLTS (9) and two 3/8" SAE WASHERS (4) as shown. Tighten the BOLTS securely.