Lifebreath 2500EFD specifications For Models, 2500IFD, Manual Before Installing Unit

Models: 2500EFD 2500IFD

1 20
Download 20 pages 50.17 Kb
Page 1
Image 1
OPERATION AND

OPERATION AND

INSTALLATION MANUAL

For Models:

 

 

 

 

IMPORTANT - PLEASE READ THIS

 

2500IFD

 

 

 

MANUAL BEFORE INSTALLING UNIT

 

2500EFD

 

 

 

 

 

 

 

CAUTION

 

 

Before installation, careful consideration must be given to

 

 

how this system will operate if connected to any other piece

 

 

of mechanical equipment, i.e. a forced air furnace or air

 

 

handler, operating at a higher static. After installation, the

 

 

compatibility of the two pieces of equipment must be

 

 

confirmed by measuring the airflow’s of the Heat Recovery

 

 

Ventilator (HRV) Energy Recovery Ventilator (ERV) by

 

 

using the balancing procedure found in this manual.

 

 

It is always important to assess how the operation of any

 

 

HRV/ERV may interact with vented combustion equipment

 

 

(ie. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.).

 

 

NEVER install a ventilator in a situation where its normal

 

 

operation, lack of operation or partial failure may result

 

 

in the backdrafting or improper functioning of vented

 

 

combustion equipment!!!

TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION

Installing Contractor

Telephone / Contact

Serial Number

Installation Date

Model

* LEAVE FOR HOMEOWNER

NOTE: Due to ongoing research and product development, specifications, ratings and dimensions are subject to change without notice.

TI-59

1203

Page 1
Image 1
Lifebreath 2500EFD specifications For Models, 2500IFD, Manual Before Installing Unit, Operation And Installation Manual