Lightolier IS:1102P1 instruction sheet IS 1102P1, INSTALLATION PROCEDURE FOR FRAME-INKIT 1102P1

Models: IS:1102P1

1 2
Download 2 pages 41.02 Kb
Page 1
Image 1
INSTRUCTION SHEET NO.

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.

This fixture is intended for installation in accordance with the National Electrical Code and local or Federal code specifications. To assure full compliance with codes and regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

INSTRUCTION SHEET NO.

IS:1102P1

A0403

Page 1 of 2

INSTALLATION PROCEDURE FOR FRAME-IN KIT 1102P1

(MAY BE USED FOR EITHER 7•11 OR LYTECASTER TRIM)

NEW CONSTRUCTION

FIG. A

FIG. B

FIG. C

FIG. D

1. FRAME-IN

2. CLOSE-IN

3. SNAP-ON

4. PUSH-UP

WARNING-(RISK OF FIRE) DO NOT INSTALL INSULATION WITHIN 3 INCHES OF FIXTURE SIDES OR WIRING

COMPARTMENT, NOR ABOVE FIXTURE IN SUCH A MANNER TO ENTRAP HEAT.

1.FRAME-IN (FIG. A)

Fasten MOUNTING FRAME to wood joist. Line-up bottom edge of ADJUSTABLE MOUNTING BAR with bottom of wood joist (Fig. E). Wire to supply leads. White fixture lead to neutral supply lead. Black fixture lead to hot (120V) supply lead. Bare fixture wire to supply ground. Use wirenuts (local hardware items). Place all electrical connections in the J- BOX. Attach J-BOX COVER onto J-BOX. (Use built-in Cable Clamp in J- BOX for non-metallic sheathed cable (Romex) or armored cable (BX).)

NOTE:

1.ADJUSTABLE MOUNTING BARS are pre-assembled on long side of MOUNTING FRAME for rigidity and ease of installation (Fig. E). MOUNTING BARS must be removed and installed on narrow side of MOUNTING FRAME if required. Locking screws are provided to lock frame in a desired position. (Fig. F)

2.MOUNTING BARS can be extended to 24”. The MOUNTING FRAME can be mounted off-center. CENTERING SLOTS are provid-- ed as guides to align adjacent frames.

3.For suspended ceilings, make certain that bottom of MOUNTING FRAME is no higher than 1” above ceiling line and notched area of ADJUSTABLE MOUNTING BARS are positioned on top of

T-BAR (Fig. G).

2.CLOSE-IN (FIG. B)

Install plasterboard or other dry type ceiling. Hole in board can be cut either on floor or after the board is secured in the ceiling. Use MOUNT- ING FRAME opening as cutting guide (make sure ROTO CLIPS are rotated out of hole area). ROTO CLIPS can only be rotated counter-clockwise. A lanced stop detail is provided to prevent ROTO CLIPS from rotating clock- wise. This detail allows easy removal of REFLECTOR TRIM by rotating TRIM counterclockwise and permits installing REFLECTOR TRIM tightly against the ceiling surface by rotating TRIM clockwise after pushing TRIM into ceiling.

NOTE: For wet plaster ceiling, use Plaster Ring Accessory (order sepa-

rately): No. 1960 for 1002P1 Frame-In Kit; No. 1961 for 1102P1 Frame-In Kit.

3.

SNAP-ON (FIG. C)

SEE SEPARATE REFLECTOR TRIM

4.

PUSH-UP (FIG. D)

INSTRUCTION SHEETS.

U.S. PATENT NO. 4,039,822

OTHER U.S. AND FOREIGN PATENTS PENDING.

®LIGHTOLIER a GENLYTE THOMAS company. 631 Airport Road, Fall River, MA 02720

Page 1
Image 1
Lightolier IS:1102P1 instruction sheet IS 1102P1, INSTALLATION PROCEDURE FOR FRAME-INKIT 1102P1, New Construction, A0403