A-2
INSTALLATION
A-2
Read this entire installation section before you
start installation.
SAFETY PRECAUTIONSELECTRIC SHOCK can kill.
• Have an electrician install and
service this equipment.
• Turn the input power off at the
fuse box before working on
equipment.
• Do not touch electrically hot parts.
• Be sure to discharge capacitors with the proce-
dure outlined in the Maintenance Section of this
manual before working in that area of the
equipment.
-----------------------------------------------------------------------
SELECT SUITABLE LOCATIONThe ES 275i will operate in harsh environments. Even
so, it is important that simple preventative measures
are followed in order to assure long life and reliable
operation.
• The machine must be located where there is free cir-
culation of clean air such that air movement in the
back and out the front will not be restricted.
• Dirt and dust that can be drawn into the machine
should be kept to a minimum. Failure to observe
these precautions can result in excessive operating
temperatures and nuisance shutdown.
• Keep machine dry. Shelter from rain and snow. Do
not place on wet ground or in puddles.
• DO NOT MOUNT OVER COMBUSTIBLE SURFACES.
Where there is a combustible surface directly
under stationary or fixed electrical equipment,
that surface shall be covered with a steel plate at
least .06”(1.6mm) thick, which shall extend not
less than 5.90”(150mm) beyond the equipment on
all sides.
-----------------------------------------------------------------------
STACKING
ES 275i’s cannot be stacked.
TILTING
Place the machine directly on a secure, level surface.
The machine may topple over if this procedure is not
followed.
HIGH FREQUENCY PROTECTIONLocate the ES 275i away from radio controlled
machinery.
The normal operation of the ES 275i may adverse-
ly affect the operation of RF controlled equipment,
which may result in bodily injury or damage to the
equipment.
------------------------------------------------------------------------
INPUT CONNECTIONSThe ES 275i should be connected only by a qualified
electrician. Installation should be made in accordance
with all local and national electric codes and the infor-
mation detailed below.
INPUT FUSE AND SUPPLYWIRE
Refer to the Technical Specifications page at the
beginning of this chapter for the proper fuse sizes and
supply cable sizes.
• Fuse the input circuit with recommended super lag
fuses or delay type circuit breakers.
• Install the proper fuse in the fuse holder in the main
disconnect panel.
INPUT SUPPLYCONNECTIONS
Be sure the voltage phase and frequency of the input
power is as specified on the rating plate, located on
the rear of the machine.
Supply line entry provision is in the case rear panel.
POWER INPUT CONNECTION
A 10 ft. power cord is provided and wired into the
machine. Follow the power cord connection instruc-
tions. Incorrect connection may result in equipment
damage.
Single Phase Input: Connect green lead to ground
per National Electrical Code. Connect black and white
or brown leads to power. Wrap red lead with tape to
provide 600V insulation.
Three Phase Input: Connect green lead to ground
per National Electrical Code. Connect black, red and
white or brown leads to power.
ES 275i
WARNING
CAUTION
CAUTION