
Dual Rail Console For Modular KVM Switch User Guide 
11 
3.1.1.  Notes 
It is essential that each step of this installation guide is completed in the stated order to 
ensure a successful installation. It is highly recommended that two persons carry out the 
installation. 
1.  Please the contents of this box against the list below, before installation. 
2.  Before installation, make sure all peripherals and computer have been turned off. 
3.  The cabinet depth range must be in 570 ~ 870 mm for the 15” and 17” console or 650 ~ 
950 mm for the 19” console. 
4.  Reliable earthing of rack-mounted equipment must always be maintained. Particular 
attention should be given to supply connections other than direct connections to the 
branch circuit. 
3.1.2.  Hardware Kits Contents 
1. Rail with front and rear bracket x 2 
2. Blocker x 2  
                Old version (2007)            New version (2008)       
3. Screw x 2 
4. Screw (length = 6 mm) x 6 
5. Key x 2