Main
Page
Contents
1
2
3
4
5
6
A
B
C
GL IN
Page
Whats New in Release 8.2r
DEFINITY ECS Release 8 Whats New in Release 8
Features
DEFINITY Enterprise Communications Server Release 8, Issue 1.0 Change Description.
Page
Hardware Minimum required hardware
R8.2r hardware
Additional hardware available
Discontinued hardware
Tool s
Commands, screens, and fields
Procedures
Page
Upgrade tips
Cautions and warnings
All calls are dropp edthis is a service interrup tion
Allow 10 minutes after unlocking to make sure the stand by SPE has fu lly ret urned to ser vice .
Product names
About This Book
Offer Categories
Security Issues
Access Security Gateway Feature
Antistatic Protection
Remove/Install Circuit Packs
Upgrade Paths
DEFINITY Communications System Generic 3r Upgrades and Additions
DEFINITY E nterprise Communications Server Release 8 Upgrades and A dditions for R8si
Conventions Used in This Book
minimum acceptable
system
vintage
Technical Monthly: Reference Guide for Circuit-Pack Vintages and Change Notices
Related Books
How to Order Books
How to Comment on This Book
DEFINITY Enterprise Communication Server Release 8 Upgrades and Additions for R8r
Where to Call for Technical Support
Trademarks
Standards Compliance
LASER Product
Electromagnetic Compatibility Standards
European Union Standards
Federal Communications Commission Statement
Part 68: Statement
Means of Connection
Upgrading G3rV2, V3, V4 to R8r and Adding Memory
DEFINITY Enterprise Communications Server Release 8 Administrators
DEFINITY Enterprise Communications Server Release 8 Maintenanc e for R8r
Software Compatibility and Translation Errors
DEFINITY Enterprise Communications Server Release 8 Administrator s
Page
Page
Upgrade the software and hardware
Check SPE
cabinet carrier slot
Disable Scheduled Maintenance and Alarm Origination to INADS
Reconfigure the Tape (G3rV2, V3 R31.0 and Earlier)
If you do not disable the TTI, the translations c an be corrupted.
Check Disk Drive
not
Install Disk Drive (if not TN1657 V4 or earlier)
Check TTI Status
Busyout MMI Circuit Packs (H/C only)
Lock the active SPE (H/C only)
Check the active tone-clock (H/C only)
DEFINITY E nterprise Communications
Power Down the Processor Carrier
Do not power down the whole c abinet; it is not necessary.
left side
Page
Page
Power Up the Processor Carrier
left side
Unlock the Active SPE (H/C only)
Allow 10 minutes after unlocking to make sure the standby SPE has fully returned to service.
Verify Interchange (H/C only)
Upgrade other carrier (H/C only)
Affix position label(s)
Verify software version
Upgrade Software
All calls are droppedthis is a service interruption.
Do not continue with the upgrad e until the translations errors are corrected.
Reset SPE status (H/C only)
List Configuration Control
Page
Page
Set Core Dump Vector
Release MMI (H/C only)
DEFINITY Enterprise Communications
Enable Customer Options and Alarm Origination
Check SPE status (H/C only)
Page
Page
Upgrading R5r/R6r/R7r to R8r without Adding Memory
Software Compatibility and Translation Errors
Antistatic Protection
Page
Page
Page
Upgrade the software and hardware
Check SPE
cabinet carrier slot
Disable Scheduled Maintenance and Alarm Origination to INADS
,
Check TTI Status
Busyout MMI Circuit Packs (H/C only)
Lock the active SPE (H/C only)
Check the Active Tone-Clock (H/C only)
Power Down the Processor Carrier
Remove the Circuit Packs
Page
Power Up the Processor Carrier
left side
Unlock the Active SPE (H/C only)
Allow 10 minutes after unlocking to make sure the standby SPE has fully returned to service.
Verify Interchange (H/C only)
Upgrade Other Carrier (H/C only)
Affix position label(s)
Verify software version
Restore Disk
Upgrade Software
All calls are droppedthis is a service interruption.
Do not continue with the upgrad e until the translations errors are corrected.
Reset SPE status (H/C only)
Page
Page
Set Core Dump Vector
Release MMI (H/C only)
DEFINITY Enterprise Communications
Enable Customer Options and Alarm Origination
Check SPE status (H/C only)
Page
Page
Upgrading R5si/R6si to R8r EPN and Adding Memory
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier Cabinets
DEFINITY Enterprise Communications Server Release 8 Administrators Guide
Page
Relocation of Port Circuit Packs
does
Site Inspections
Power and Ground
DC Isolator
Emergency Transfer Stations
Converting the Translations
Software Upgrades
DEFINITY Enterprise Communications Server Release 8 Administrator s Guide
ISDN Gateway
Single-Mode Fiber Attenuators
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier
Page
Page
Preliminary Procedures
Make Spare Translation Card and Mail to STS for Upgrade
Check Software Release Letter
Busyout Multimedia Interface Circuit Packs
Save Translations and Announcements
Release 5/6si to Release 8r
3-11Release 5/6si to Release 8r
3
The equipment in Table 3-2 must be on-site before the upgrade begins. Table 3-2. Required Hardware
DEFINITY Enterprise Communications Server Release 8 Maintenance for R8r
Power Down Existing System
Disconnect Power and Ground
Install Emergency Transfer Ground Wire
Disconnect Equipment and Cables
Remove Circuit Packs
Disconnect TDM/LAN Cables and ICC Cables
Remove the Existing Control Cabinet
A port cabinet may weigh as much as 125 poun ds. Use lifting precautions.
Unpack and Install Expansion Control Cabinet
Install Port Cabinets
Change Cabinet Address Plugs
Page
Install TDM/LAN Bus Terminators
Page
Connect TDM/LAN Cables and ICC Cables
Upgrades and Additions for R8r
3-21Release 5/6si to Release 8r
Upgrading R5si/R6si to R8r EPN and Adding Memory
3
Figure 3-4. ICC Pinfield Blocks on J58890N Expansion Control Cabinet
Figure 3-5. ICC Pinfield Blocks on J58890H Port Cabinet
CURL Pinfield
Interconnect Port Networks with Fiber Optic Cabling Standard Reliability Release 8r
Fiber Remoted Port Networks
Page
Page
For 1 or 2 Fiber-Remoted Expansion Port Networks
Page
Interconnect Port Networks with Fiber Optic Cabling High Reliability Release 8r
Page
For 2 Collocated Expansion Port Networks
Page
For 1 or 2 Fiber-Remoted Expansion Port Networks
Page
Interconnect Port Networks with Fiber Cabling Critical Reliability Release 8r
Page
Page
Page
Page
Switch-Connected Port Networks
Page
Page
Page
Page
Page
Page
DS1 CONV-Remoted Cabinets
Connect Power and Ground
Reference Guide for Circuit Pack Vintages and Change Notic es
Install System Access Ports
outgoing
Remove Emergency Transfer Ground Wire
Reboot the System
DEFINITY Communications System Generic 3 Manag ement Applications
Label Main Distribution Frame
Reconnect Cables
Power Up the EPN Cabinet
Install Rear Ground Plates (Systems with
Install Front Ground Plates (Systems with
stacked
Install Cabinet Clips (Systems without
Install Cable Clamps
Re-record Announcements (TN750/B Only)
Administer Fiber Links
Page
Page
Page
G3vs with Intel 386 or Risc Processor to R8r
Page
Page
Page
Page
Preliminary Procedures
Remove the Present System
Save Translations and Announcements
Disable Alarm Origination to INADS
Power Down Present System
Install Emergency Transfer Ground Wire
Disconnect Power and Ground
Remove the Present System
Install the Release 8r Cabinets
Unpack and Install the Release 8r Cabinet
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier
Do not power up the Release 8r system.
Remove Emergency Transfer Ground Wire
Restore Disk Full
Page
Page
Re-Record Announcements (TN750/B)
DEFINITY Enterprise Communications Server Release 8
Copy Announcements (TN750/B)
Upgrade Completion
Install Remaining Hardware and Admin ister the System
DEFINITY Enterprise
Page
Page
Page
Page
Multicarrier G2 Universal Module to R8r EPN
Single-Mode Fiber Attenuators
Page
Relocation of Port Circuit Packs
does not
Technical Monthly
Site Inspections
cannot
Power and Ground
DEFINITY Enterprise Communications Server Release 8 System Description Pocket Reference
DC Isolator
Power-Failure Stations
Software
DEFINITY Enterprise Communications Server Release 8 Adm inistrators
Alarm Connection
5-7Read This First
Table 5-1. Pinouts for D6 Connector on G2 System
5-8Read This First
Table 5-2. Pinouts for Auxiliary Connector on Release 8 Systems
Make Source Tape for TRACS Report
System Upgrades
Page
Page
Page
Page
Page
Standard Reliability
DEFINITY Enterprise Communications Server Release 8
DEFINITY Enterprise
Page
Remove Circuit Packs from Module Control Carrier A
Remove Module Control Carrier A Disconnect TDM/LAN Cables
Page
Remove Carrier Ground Straps
Page
Unpack and Inspect Expansion Control Carrier
Install New Expansion Control Carrier A
Page
Page
Page
Page
Page
For Two Collocated Expansion Port Networks
Page
Page
For Either One or Two Fiber-Remoted Expansion Port Networks
For Two Fiber-Remoted Expansion Port Networks
Page
Reference Guide for Circuit Pack Vintages and Change Notices
Remove Power-Failure Ground Wire
DEFINITY Communications System Generic 3 Management Applic ations
Operations
Page
Page
Page
DEFINITY E nterprise Communications Server Release 8 Administrators Guide
Reconnect Cables to Upgraded EPN Cabinet
DEFINITY Enterprise Communications Server Release 8 Maintenance for R8r
Translation corruption detected; c all Lucent Technologies distrib utor
Page
High Reliability
DEFINITY Enterprise Communications Server Release 8
DEFINITY E nterprise Communications
Page
Remove Circuit Packs from Module Control Carrier A
Remove Module Control Carrier A
Page
Page
Page
Unpack and Inspect Expansion Control Carrier
Install New Expansion Control Carrier A
Page
Page
Page
Interconnect Port Networks High Reliability
Page
Page
For Two Collocated Expansion Port Networks
Page
Page
For Either One or Two Fiber-Remoted Expansion Port Networks
For 2 Fiber-Remoted Expansion Port Networks
Page
Page
Page
Remove Power-Failure Ground Wire
DEFINITY Communications System Generic 3 Management Applications
Operations
Page
Page
Page
DEFINITY Enterprise Communications Server Release 8 Administrators Guide
Reconnect Cables
Page
DEFINITY Enterprise Communications Server Release 8 Maintenance for R8si
Page
5-75Critical Reliability
Critical Reliability
Upgrade Cabinets
must
The equipment in Table 5-14
An existing universal module c abinet is always upgrad ed to an EPN.
Page
Page
Carriers A and B
Remove Module Control Carriers A and B
Page
Page
Page
Prepare the New A and B Position Carriers
Install the New A and B Position Carrier s
and
Page
Page
Page
Page
Test the CURL
Interconnect Port Networks Critical Reliability
Page
For 2 Collocated Expansion Port Networks
Page
Page
Page
Page
Page
For Either 1 or 2 Fiber-Remoted Expansion Port Networks
For Two Fiber-Remoted Expansion Port Networks
Page
Upgrades and Additions for R8r
5-102Critical Reliability
B
Multicarrier G2 Universal Module to R8r EPN
Figure 5-32. Critical Reliability Release 8 with 2 or 3 Port Networks
Page
Page
Page
Remove Power-Failure Ground Strap
DEFINITY Communications System Generic 3 Management Applications
Operations
Page
Page
Page
DEFINITY Enterprise Communications Server Release 8 Administrators Gui de
Close Upgraded EPN Cabinet and Reconnect Cables
Page
Page
Page
Page
Adding or Removing Cabinet Hardware
Single-Mode Fiber Attenuators
Add Circuit Packs
Suppress Alarm Origination
DEFINITY Enterprise Communications Server Release 8 Administrator s Guide
List of Circuit Packs
Page
Page
Page
Page
Add the Fiber Optic Cable
Unpack and Inspect
LASER Product
Cabinet Preparation
Page
Page
6-13Add the Fiber Optic Cable
BOOT/
AUDIXAUDIX
lcda3fopEWS 110398
Figure 6-4. Remove the Fan Cover
SHUTDOWN BOOT/
SHUTDOWN
Install the Pass-thru Kit
Page
Page
Page
Page
6-19Add the Fiber Optic Cable
BOOT/
AUDIX
lcda5fopEWS 110398
SHUTDOWN BOOT/
Page
Test the Installation
Installation and Test for Adjuncts and Peripherals
Install a New EPN Cabinet in an Existing System
Connect Power and Ground
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier Cabinets
Interconnect Cabling Release 8r
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier
Direct-Connect New EPN to Existing PPN (Standard Reliability)
Direct-Connect New EPN to Existing PPN (High or Critical Reliability)
Direct-Connect New EPN to Existing PPN and EPN (Standard Reliability)
Direct-Connect New EPN to Existing PPN and EPN (High or Critical Reliability)
Interconnect Cabling Release 8r
DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier Cabinets
EPN (Standard Reliability)
EPN (High Reliability)
Page
Page
EPN (Critical Reliability)
Page
Page
Remove an EPN Cabinet from an Existing System
All Systems
all
DEFINITY Enterprise Communications Server Release 8 Administrators Guid e
Unadminister Fiber Links (Simplex Systems)
Page
Removing the Hardware
series
parallel
Unadminister Fiber Links (Duplex Systems)
Page
Removing the Hardware
series
parallel
Troubleshooting Message Waiting Lamps On
Add External Modem to EPN
U.S. Robotics Model USR 33.6 EXT External Modem
Add DCS Interface
AT&T System 75/85 Network and Data Services Reference Manual
System 75 Application Notes Network Servic es
DEFINITY ECS Release 8 Administration for Network Connectivity
Add Circuit Packs
Install Cables
Enter Added Translations
DEFINITY Communications System Administration for Network Connectivity
Add IP Interface Assembly
DEFINITY Enterprise Communications Server Release 8 Overview
Installing in Media Processor Mode
DEFINITY Enterprise Communications Server Administration for Network Connec tivity.
Prepare for Installation
Check your Shipment
do not open it
Page
Connect the Cables
Connect the Modem
Connect the Ethernet
Page
Page
Administer the TN799B C-LAN
DEFINITY Enterprise Communications Server Administrati on for Network Connectivity
Administer the IP Interface
Administration Steps
DEFINITY E nterprise Communications Server Administration for Network Connectivity for Release 8
Page
Test the External Connection to the LAN
Installing in IP Trunk Mode
Prepare for Installation
Check your Shipment
do not open it
Connect the Cables
Connect the Modem
Connect the Monitor, Keyboard, and Mouse
Connect the Ethernet
Install the Circuit Pack
Page
Test the Modem
Administer the IP Interface
Administration Steps
Log onto the TN802B Interface Server
A-Law versus Mu-Law
Assign Server and Domain Names
Assign an IP Address
Page
Page
Page
Page
Check Network Services
Test the External Connection to the LAN
nnn.nnn.nnn.nnn
Test the IP Interface Onboard LAN Connections
192.11.13.9
192.11.13.8
Upgrading a TN802 V3 (or later) to a TN802B (MedPro mode)
Connect the Monitor, Keyboard, and Mouse
Upgrading IP trunks (R7) to H.323 trunks
Page
Upgrade to TN802B (R8)
Page
Circuit Pack Verification
DEFINITY ECS Release 8 Network Connectivity
Add TTC Japanese 2Mbit Trunks
Installation
DEFINITY E nterprise
Add a Control Carrier (Add Duplication)
Page
Shutd own
Reset Sys tem
Neglecting to shut d own an AUDIX assembly before powering d own
Power Down Port Networks
Remove Doors and Panels and Disconnect Cables
Remove Circuit Packs from Port Carrier B
Remove Port Carrier B
6-84Add a Control Carrier (Add Duplication)
E
D
10. Remove the carrier by sliding it out the front of the cabinet.
Figure 6-28. TDM/LAN Connections for Standard-Reliability PPN
B
A
C
Page
Prepare New Control Carrier B
Install New Control Carrier B
Page
Page
6-89Add a Control Carrier (Add Duplication)
B
E
D
A
Page
6-91Add a Control Carrier (Add Duplication)
Relocate Port Carrier B
Connect Management Terminal or PC
Enable SPE Duplication
Enable PNC Duplication
Add a Switch Node Carrier (Standard Reliability)
Page
Neglecting to shut d own an AUDIX assembly before powering down
Power Down Cabinet
Remove Doors
Disconnect Ground Cables
Remove Circuit Packs from Port Carrier D
Remove Port Carrier D
Page
6-99Add a Switch Node Carrier (Standard Reliabi lity)
Prepare New Switch Node Carrier D
Figure 6-34. ICC Connections for Switch Node Carrier
Install New Switch Node Carrier
Page
Page
Page
Page
6-105Add a Switch Node Carrier (Standard Reliabi lity)
Figure 6-37. Critical-Reliability Fiber-Optic Connections through Center Stage Switch
EXPANSION CONTROL CARRIER - J58890AF
REAR VIEWREAR VIEW
CABINET 1 PPN W/ONE DUPLEX SWITCH NODE
CABINET 2 THRU 16 EPN
Page
Page
Add a Switch Node Carrier (High or Critical Reliability)
Page
Neglecting to shut d own an AUDIX assembly before powering down
Power Down System
Remove Doors and Panels and Disconnect Cables
Remove Circuit Packs from Port Carrier D
Remove Port Carrier D
Page
6-113Add a Switch Node Carrier (High or Critical Reliability)
Prepare New Switch Node Carrier D
Figure 6-39. ICC Connections for Switch Node Carrier
Install New Switch Node Carrier D
Page
6-116Add a Switch Node Carrier (High or Critical Reliability)
Figure 6-41. TDM/LAN Connections for Critical Reliability R8r EPN
6-117Add a Switch Node Carrier (High or Critical Reliability)
Figure 6-42. TDM/LAN Connections for Critical Reliability R8r PPN
Page
Page
6-120Add a Switch Node Carrier (High or Critical Reliability)
Figure 6-43. Critical-Reliability Fiber-Optic Connections through Center Stage Switch
EXPANSION CONTROL CARRIER - J58890AF
REAR VIEWREAR VIEW
CABINET 1 PPN W/ONE DUPLEX SWITCH NODE
CABINET 2 THRU 16 EPN
Page
Enable PNC Duplication
DEFINITY Enterprise
Add Center Stage Switch
Page
Fiber Engineering for 2 SNs
Page
Fiber Engineering for 3 SNs
Add MCC Port Carriers
Page
Neglecting to shut d own an AUDIX assembly before powering d own
Power Down MCC Port Network
Install Port Carrier
Page
Power Up MCC Port Network
Enter Added Translations
Page
Update Port-Assignment Records
6-135Add MCC Port Carriers
Figure 6-51. Locations of Grounding Jumpers
Page
Page
6-138Add MCC Port Carriers
Figure 6-54. TDM/LAN Bus Connections for Standard- or High-Reliability EPN
B
E
D
A
Figure 6-55. TDM/LAN Bus Connections for Critical-Reliability EPN
B
E
C
D
Page
Page
Installing an Integrated Channel Service Unit (ICSU) Module
Checking for required components
Installing the 120A CSU
Page
Integrated CSU Module Installation and Operation
Page
Installing a 3150/3170 Channel Service Unit
Page
Page
A
Fiber Link Administration
Administer Fiber Links
Circuit Pack Form
before
DEFINITY Enterprise
DEFINITY Communications System Generic 3 Planning and Configuration
Administer Fiber Links on Simplex Systems
Page
Administer Fiber Links on Duplex Systems
Page
Page
Fiber Link Administration Form
Administration commands
Simplex PNC
Administration of PNC Duplication
Form instructions Page 1 of the form
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
B
Troubleshooting an Upgrade
New for Release 8
ATM PNC Duplication (ATM PNC-DUP)
DEFINITY ECS Release 8 Maintenance for Release R8r
ATM Expansion Interface (ATM-EI)
if they are administered to serve the ATM Port Network Connectivity (ATM-PNC) for DEFINITY
Mass Storage System
Page
Page
Control LAN (C-LAN)
System Links (SYS-LINK)
Troubleshooting Guidelines
from
must
to
Removable Media Troubleshooting Guidelines
Avoid saving translations or announc ements
Troubleshooting Release 8 Upgrades
No Translations After Upgrade
One Side Upgrades, the Other Side Does Not (No Shadowing); Active Side Has Correct R8 Load
only
Restore Disk Install or Restore Dis k Full Fails
Message Waiting Lamps On (After Removing an EPN)
Tone Clock Does Not Function in New EPN
Translation Corruption Detected
Unsuccessful Translation Read on System Restart (If Upgrading From Pre-R7.1)
Software Incompatibility
Re-install the ISDN-PRI Links (Only for Failed Upgrades)
C
Access Security Gateway
Using the ASG Mobile
GL-1
GL
Glossary and Abbreviations
Numerics
A
GL-2
See
Third Party Take Co ntrol
Third Party Take Control,
GL-3
GL-4
(DAC)
GL-5
GL-6
GL-7
B
GL-8
bits per second ( bps)
baud and bit rate.
GL-9
C
GL-10
Third Party Selective Hold, Third Party Reconnect, Third Party Merge
GL-11
event report
Call Control
International Telecommunications Union
GL-12
Preferr ed
GL-13
(COS)
Restriction (COR)
switc h-p roces sing eleme nt (SPE)
GL-14
duplicated common control, and duplication.
GL-15
D
GL-16
return error
GL-17
analog-to-digital c onverter (ADC)
GL-18
Third Party Domain Control Request
Third Party Domain Control
GL-19
Third_Party_Domain_Control
GL-20
E
GL-21
GL-22
F
GL-23
GL-24
G
H
GL-25
critical-reliability sys tem
I
GL-26
not
GL-27
Network (ISDN) andIntegrated Services Digital Network Ba sic Rate Interface (ISDN-BRI).
GL-28
GL-29
K
L
GL-30
M
GL-31
See
GL-32
GL-33
proces sor dat a modul e (PD M)
GL-34
GL-35
N
GL-36
O
GL-37
not
P
bus and packet switching.
GL-38
GL-39
GL-40
GL-41
Q
R
GL-42
GL-43
S
GL-44
GL-45
GL-46
GL-47
T
GL-48
Third Party Call Control
event reports
GL-49
U
GL-50
V
W
GL-51
Z
Page
IN
Index
Numerics
A
B
E
F
G
H
I
J
L
M
N
O
T
U
V
Wed like your opinion.