Multicarrier G2 Universal Module to R8r EPN
5-110Critical Reliability
5
Set Additional Administration
1. Type list configuration software-version long and press Enter to
compare the version number o f the Release 8 software program
(displayed on the ter minal) with the version number (written on a lab el on
the processor’s facep late). If the version numbers are not the same,
change the version number on the processor label so that they ag ree.
2. Type change system-parameters customer-options and press Enter.
Use this screen to enable the G3 V6 option and to assign the customer’s
other right-to-use options on the Release 8 upg rade order. See

DEFINITY

Enterprise Communications Server Release 8 Administrator’s Gui de

, for
details on enabling these op tions.
3. Type change site-data and press Enter. Use this screen to assign
system-specific infor mation (such as building , floor, stations, and so
forth).
4. Type status system 1 and press Enter to verify that the system is in the
“active/standby” mode.
5. Type save translation and pr e ss Enter. This instructs the system to write all
translation information from memory to the translation c ards.
!WARNING:

If the terminal screen displ ays “translation corruption d etected; c all

Lucent Technologies distributor immed iately”, an error was detected

in the translations. Call your Lucent Technologies representati ve.

Close Upgraded EPN Cabinet and ReconnectCables
1. At the upgraded EPN, set the main circuit breaker to OFF.
NOTE:
Powering down an EPN without powering down the PPN will set off
alarms. However, these alarms should c lear after power is restored
to each EPN.
2. Temporarily disconnect the lig htwave transceivers and fib er optic cab les
from the appropriate c arriers.
3. Replace the back d oors or back p anels previously removed.
4. At the EPN cabinet, reconnect the lig htwave transceivers, fiber op tic
cables, and the c onnector cables assoc iated with the carrier b eing
replaced .