Procedure for Installation on Carpet (Vertical Position)

1

Set that the built-in anti-vibration boards on both the left and right sides are set to the vertical installation position “90”.

Attach the left and right brackets (A) using the hexagonal bolt (M4 x 5).

Attach the left and right brackets (A) to their respective brackets (B) using the hexagonal bolts (M6 x 12) and the hexagonal nuts (M6).

Built-in anti-vibration board position

Hexagon bolts (M6 x 12)

Hexagonal bolts

(M4 x 5)

2

Pull back the carpet and determine

3

• Remove the hexagonal nuts and

 

 

where to attach the unit.

 

take off the changer.

 

Stick the supplied double-sided

 

 

 

 

tape to the bottom of the brackets

 

 

 

 

(B) and peel off the paper backing.

 

 

 

Affix the unit to the floor by pressing

 

 

 

 

in place.

 

 

4

Using a knife, cut “X”s in the carpet

5

• Once more, use the hexagonal nuts

 

 

directly above the brackets (B) bolts.

 

to attach the changer on top of the

 

Return the carpet to its original

 

carpet.

 

 

 

 

 

position allowing the bolts to stick

 

 

 

 

through.

 

 

9

Page 9
Image 9
Magnadyne EAX540 manual Procedure for Installation on Carpet Vertical Position