Manitowoc Ice installation instructions K00019 STACKING KIT E-1100& G-1700

Models: E-1100

1 2
Download 2 pages 4.88 Kb
Page 1
Image 1
K00019 STACKING KIT E-1100 & G-1700

K00019 STACKING KIT E-1100 & G-1700

 

Installation Instructions

 

Parts List:

Description

Quantity

Part Number

Item

1.

Lower Ice Chute Weldment (one with insulation)

2

6605514

2.

Upper Ice Chute Weldment

2

6605414

3.

Front Chute Support

1

6608614

4.

Top Front Mounting Bracket

1

6605614

5.

Bottom Front Mounting Bracket

1

6605714

6.

Bottom Rear Mounting Bracket (Angle )

2

6213314

7.

Top Rear Mounting Bracket (90∟)

2

6213214

8.

Water Shield Weldment

1

6653414

9.

Stabilizer Bracket

1

6611814

10.

#10-32 x 1/2 Machine Screw

1

5027021

11.

1/4-20 x 5/8 Hex Brass Machine Screw

2

5031841

12.

#10-24 x 5/8 Self-tapping Screw

14

5202053

13.

#10-24 x 3/8 Self-tapping Screw

6

5202103

14.

#10-32 Hex Nut

1

5429431

15.

1/4-20 Hex Nut

2

5429531

16.

#8-32 Wing Nut

12

5489021

17.

1/4 Split Ring Lock Washer

2

5545111

18.

#10 Split Ring Lock Washer

1

5573163

19.

Installation Instructions

1

8001953

20.

Locking Plate

1

6236814

21.

Foam Tape

250”

9202393

22.

Corner Brace

1

6604714

Installation Instructions:

1.The K019 stacking kit is used for stacking two E-1100 machines, two G-1700 machines, or one E-1100 and one G- 1700 machine. The bin must be leveled before proceeding to step 2.

2.INSTALLATION OF CORNER BRACE:

A.Remove foam tape, as shown on Illustration 1.

B.Remove seven screws on the top of the bin and locate corner brace, as shown in Illustration 1. Secure with seven screws previously removed.

C.Use foam tape from kit around the perimeter of corner brace, as shown in Illustration 1.

3.INSTALLATION OF MACHINES:

A.See service manual for uncrating and inspection of both machines.

B.Remove top cover from lower machine.

C.Set machine carefully and squarely on bin.

D.Position water shield from kit, as shown in Illustration 2. Apply foam tape on the perimeter and across partition panel, as shown in Illustration 2.

E.Set top machine carefully and squarely on bottom machine.

F.Remove front, back, and side panel on the evaporator end of both machines.

Manitowoc Ice, Inc.

2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA

8001953

Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879

Page 1 of 5

Web Site - www.manitowocice.com

Rev. 05/11/01

Page 1
Image 1
Manitowoc Ice installation instructions K00019 STACKING KIT E-1100& G-1700, Installation Instructions