Marvel Industries 60RD Full Overlay Panel Installation Instructions, Step Wood Screws Required

Models: 60RD

1 12
Download 12 pages 24.88 Kb
Page 6
Image 6
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS

FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS

5/16 PHILLIPS HEAD SCREWS HOLDING DRAWER FRONT

GASKET

figure 2

figure 1

figure 3

Step 1:

Wood Screws Required

1.A #8 pan head wood screw should be used to properly secure the overlay panel. A total of 8 screws will be needed.

2.Use only pan head screws.

3.Do not select a screw that is longer than the wood thickness at the screw locations.

4.Use recommended pilot holes for the frame material (see chart below).

Pilot Hole Drill Sizes for Wood Screws

 

Wood Screw Size

Work Material

 

8

Hardwood

3/32

Softwood

5/64

Step 2:

Remove Drawer Fronts

(Note: The overlay panel may be installed without removing the drawer fronts from the drawer bod- ies, but the full drawer assembly is not as easy to handle as the drawer front alone.)

1.Remove drawer from unit. Begin by pulling out the drawer. Locate the drawer lock which can be found on the outside of the cabinet slide (fig. 1).

Push the back of the drawer lock forward and then down, releasing the drawer from the cabinet slide (fig. 2). Repeat this on the opposite side of the drawer. Lift the drawer up from the slides at 90° to fully extricate the drawer from the cabinet (fig. 3).

2.Remove drawer fronts. Do this by removing the 8 phillips screws and washers securing the drawer front to the drawer body. Mark lightly with an erasable marker the position of the stainless drawer liner as it secured to the stainless drawer before removing screws.

3.Remove the gasket from the drawer front. Do this by pulling the gasket out of the channel that holds it to the drawer front .This will expose the clearance holes for mounting the overlay panel.

6

Page 6
Image 6
Marvel Industries 60RD Full Overlay Panel Installation Instructions, Step Wood Screws Required, Step Remove Drawer Fronts