Table
Built of rugged composite material, the
The structural steel frame of the
Water System
The water system of the
Unpacking and Preparation
Carefully open carton. Remove the accessory pack. Lift the saw out of the carton by the pan, and place onto a level work surface. Open the accessory pack, and check each item with the contents list and illustration below, making certain that all items are accounted for and in good condition before discarding any packing material. If there are any missing or damaged parts, call our toll free number
Contents of carton: Saw Frame Assembly and Accessory Pack
Accessory Pack contains:
owners | pump | warranty |
| splash | 7" tile blade | cutting head | water pump | ||
manual | manual | card |
| guard |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
blade nut wrench | blade shaft wrench | wing screw | washer | fence |
Initial Assembly
Warning
Do not operate saw until fully assembled.
Installing the Cutting Head
Remove the three screws (part# G4) from the mounting flange of the frame assembly and set them aside. From the Cutting Head, loosen the davies knob (part# B3) and remove the wing nut (part# B5) on the blade guard. Remove the blade guard and set it aside. With the Cutting Head, align the three screw holes of it”s casting (part# G1) with the mounting screws through the casting into the saw frame and retighten. Reinstall the blade guard and connect the vinyl water hose to the brass fitting located on the blade guard.
Installing the Blade
Loosen the davies knob (part# B3) and wing nut (part# B5) on the blade guard. Raise the blade guard to its highest position and retighten the wing nut. Loosen and remove the blade shaft nut (part# H6) & outside blade flanges (part# H5) and set them aside. Place the diamond blade onto the motor shaft against the inside flange. Ensure that the rotation arrow (stamped onto the steel core of the blade) points
Installing the Water Pump
The end of the water hose (lying in the water pan) has a 3/8” diameter vinyl sleeve attached. Affix this 3/8” sleeve onto the spout of the water pump, using the plastic adapter provided. Place the pump anywhere in the water pan. Route the water pump power cord through the slot in the side of the table as shown. Fill the pan with clean water, and ensure that the water level is above the intake port of the pump. It is very important to keep the pump’s intake port under water during operations. Any air introduced to the pump could cause an interruption of water flow. This pump is fully submersible, and you may wish to place it adjacent to your saw in a bucket of water to provide a continuous flow of clean water to your blade (this helps extend the life of both blade and pump). Connect the plug end of the water pump into the water pump receptacle located on the motor. The pump is activated by the ON/Off switch on the electric motor.
3