INSTALLATION INSTRUCTIONS

Install the ST-1 in the most convenient location for ease of cleaning, maintenance and general operation. Avoid installing in locations with drafts, close proximity to grease or vapor-producing appliances or other high ambient heat equipment. Allow approximately 1” clearance on sides and back of unit for proper air circulation. Allow sufficient overhead clearance for proper heat dissipation. This toaster must be level for proper operation and comes equipped with 1” adjustable legs for this purpose.

Before operating this unit, be sure that the following two components are properly installed:

1.The reflector tray is installed below the lower heating elements before shipping. It merely slides under the conveyor. NOTE: Proper toasting cannot be performed without reflector tray installed.

2.The toast receiving tray is packaged separately and must be installed before operating this unit. For front delivery position, slide the receiving tray into the toaster cavity below the control panel, making sure the lipped end is towards the back. Place the lipped end over the two (2) protruding pins located at the rear of the toaster cavity. For rear delivery position, slide the receiving tray into the cavity from the back of the toaster and place the lipped end over the 2 protruding pins closest to the front of the toaster (See Figure 1).

Use these two mounting pins for front delivery position.

Toast receiving tray in rear delivery position.

Toast receiving tray in front delivery position.

ELECTRICAL SPECIFICATIONS

! WARNING !

This toaster must be plugged into the proper voltage which is specified on the data plate located on the back panel of the toaster. Use of any other voltage or altering of plug will damage unit, void warranty and may cause injury.

 

 

Voltage

 

Amperage

 

Max. Power

 

Frequency

 

Phase

 

Cord

 

Plug

 

 

(Volts AC)

 

(Amps)

 

(KW)

 

(HZ)

 

 

(Attached)

 

(Attached)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120

14.8

1.7

50/60

1

 

3’

 

NEMA 5-15P

 

208

12.5

2.4

50/60

1

 

3’

 

NEMA 6-15P

 

220

9.6

2.1

50/60

1

 

3’

 

NEMA 6-15P

 

240

10.4

2.4

50/60

1

 

3’

 

NEMA 6-15P

 

 

*220

 

9.6

 

2.1

 

50/60

 

1

 

3’

 

None

 

 

*240

 

10.4

 

2.4

 

50/60

 

1

 

3’

 

None

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The circuit on which the receptacle is installed must be of adequate wiring size and sufficient capacity to meet the requirements indicated on the unit data plate and in accordance with the National Electrical Code and local electrical installation codes. * The 220V electrical information in the shaded area pertains to European models. The 240V electrical information in the shaded area pertains to United Kingdom models.

ST-1 Mini-Conveyor Toaster Operations Manual

3

Page 3
Image 3
Merco Savory ST-1 manual Installation Instructions, Electrical Specifications