3 – Installation of the cables for EPO, external communication and set in parallel :

In order to ensure a good positioning of the different strands of cables on the front panel, it is necessary to follow the recommendations of installation below :

Do separate the strands of fine wire from the power cables along their progress.

Parallel configurations :

A torus ferrite provided with the parallel devices, in order to guarantee the EMC class A level, must be installed like indicated on the figure below ;

External By-Pass

 

cubicle cables

 

not supplied

EPO cable

(max. 1.5 mm²)

To be clamp

 

 

separately

 

Not supplied

 

(max. 2.5 mm²)

MGE UPS SYSTEMS

3

Addenda du manuel d’installation 5103056000_AB

Page 3
Image 3
MGE UPS Systems 3000 user manual Max .5 mm²