![](/images/new-backgrounds/1259254/25925425x1.webp)
SECTION 3 − INSTALLATION
3-1. Specifications
| Amperes Input at |
|
|
|
|
| Rated | Maximum | |
| Rated Load |
|
| Rated | Type of | Plasma | |||
| Output 60 Hz |
|
| Output | Output | Gas | Cutting | ||
|
|
|
|
|
|
|
| Capacity | Voltage DC |
| 230 V | 460 V | KVA | KW |
|
|
| ||
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
Single- |
|
|
|
| 80 A @ 140 |
| 7.2 CFM |
|
|
63 | −− | 14.6 | 13.9 | Volts DC, |
|
|
| ||
Phase | 40% Duty | Direct | (204 L/min) |
|
| ||||
|
|
|
|
|
| ||||
|
|
|
|
| Cycle | Current, | At 80 PSI | 7/8 in |
|
|
|
|
|
|
| Straight | (552 kPa) | (22 mm) | 350 |
|
|
|
|
| 80 A @ 140 | ||||
|
|
|
|
| Polarity | Air Or | At 10 IPM |
| |
35 | 18 | 14.1 | 13.4 | Volts DC, | (DCEN) | Nitrogen |
|
| |
|
|
|
|
| 60% Duty |
| Only |
|
|
|
|
|
|
| Cycle |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3-2. Duty Cycle And Overheating
Duty Cycle is percentage of 10 min- utes that unit can cut at rated load without overheating.
If unit overheats, thermostat(s) opens, output stops, and cooling fan runs. Wait fifteen minutes for unit to cool. Reduce amperage or duty cycle before cutting.
Y Exceeding duty cycle can damage unit and void war- ranty.
60% Duty Cycle
6 Minutes Cutting | 4 Minutes Resting |
40% Duty Cycle
4 Minutes Cutting | 6 Minutes Resting |
Overheating
0 | A | |
| 15 | |
| OR | |
Minutes | Reduce Duty Cycle | |
duty1 4/95 | ||
|