CORD JACKET
PLACEMENT: l/8”
CLAMP WITH WIRES
ORIENTED AS SHOWN
LOCK NO.
BLOCK NO. 2.Z
INSULATION TO BE RECESSED l/18”
MIN. IN PLASTIC CAVITY OF TERMINAL.
WHI TE(
NOTE:
All leads must be held to f l/8”.
All field leads to be measured from and perpendicular to laminations. All lead lengths are before stripping
1 TERMINAL DESCRIPTION 1
/I
I III