(3) Air conditioning unit start/stop test check sheet (Output example) “General Equipment (IC IO signal)”
(4) Air conditioning unit start/stop test check sheet (Output example) “General Equipment”
Contents
Main
Please read this manual before using the unit.
Contents
Page
Page
Page
1. Safety Precautions
Safety Guidelines for the Computer Running the with the TG-2000A.
(1) Precautions for selecting a computer
s
a
A
2. System Requirements
We recommend the following software and hardware when using this application (TG-2000A).
(Only some functions. Refer to section 2.3 for details)
2.2 Compatible Units
5
2.3 Restrictions
Up to 640 units (including 20 PLCs for general equipment)
Up to 2000 units *7
(2) Group setting restrictions
Page
Page
Page
Page
2.4 Other Devices
3.1 System Configuration Example
3.2 Hardware Connection Diagram
3. System Configuration
4. Flow of Site Adjustment
4.2 Tools for Site Adjustment
4.6 Step 4: Test operation from integrated centralized control software TG-2000A
5.1.1 Checking the AG-150A version and the G-50A version
5. Installation
Page
5.1.2 Preparing for TG-2000A setup
5.2 TG-2000A Setup (TG-2000A Ver.5.5* or later)
Page
5.2.1 Setup (TG-2000A Ver.5.5* or later)
5.2.2 Running TG-2000A Setup (New setup) (TG-2000A Ver.5.5* or later)
Page
5.2.3 Upgrading the TG-2000A version (TG-2000A Ver.5.5* or later)
Step 1) TG-2000A quit
5.2.4 TG-2000A Uninstall (TG-2000A Ver.5.5* or later)
Page
5.2.5 Adding files to the ignore list on the anti-virus software (TG-2000A Ver.5.5* or later)
5.3 TG-2 000A Setup (TG-2000A Ver.5.1*)
5.3.2 Running TG-2000 A Setup (New set up) (TG-2000A Ver.5.1*)
Step 2) Database setup
Step 3) TG-2000A setup
Page
Page
5.3.4 TG -2 000 A Unin st all (TG-2000A Ver.5.1*)
5.3.5 Adding files to the ignore list on the anti-virus software (TG-2000A Ver .5.1*)
6. Part Names and Functions
6.2 Basic Mouse Operation
Page
Page
Page
Page
Page
Page
Page
7.1 Before Startup
7. Initial Startup and Sh utdown
7.3 Shutdown
8. System Setting Procedu
r
e
8.3 User Set-up
51
8.3.1 General Operation
General operation set up
layout that was created for AG-150A cannot be used with the TG-2000A.
Page
8.3.4 Energy Saving /Peak Cut and IC I/O Sigmal/Interlocked Control Setting
8.3.5 Energy Monitoring Related
Page
Page
Page
8.3.7 Trend setting
8.3.8 Transmission of automatic output file by email
Page
8.4 Site Name Set-up
8.6 AG-150A/G-50A Connection Set-up
8.6.2 Number of AG-150A/G-50A set-up (Step 1)
Page
8.7 System Configuration Set-up
8.7.2 AG-150A/G-50A data collection (Step 1)
8.7.3 Unit composition set-up (Step 2)
Page
Page
8.7.4 Set-up of refrigerant system (Step 3)
Page
Page
8.7.6 Interlocked setting (Step 5)
8.8
8.8.2 DIDO controller(general equipment) set-upStep 1
8.8.3 AI controller Set-upStep 2
8.8.4 PI controller (Meter) Set-up (Step 3)
8.9.1 Setting Procedure and Restrictions
8.9.2 Number of PLC unit set-up (Step 1)
8.9.3 PLC set-up and initial setting (Step 2)
8.9.4 Function setting (Step 3)
8.9.5 Advanced setting (air conditioner status monitor setting) (Step 4)
8.9.6 Advanced setting (Peak cut function setting) (Step 5)
Page
Page
8.10 IC I/O Signal Set-up
8.10.1 Setting Procedure and Restrictions
8.10.2 General Equipment Set-up (Step 1)
Page
8.11 Monitoring Screen Set-up
8.11.2 Set-up of model name (Step 1)
8.11.4 Creation of a sub screen plane view (Step 3)
8.11.5 Set-up of the number of floors, and floor name (Step 4)
8.11.6 Creation of a plane view (Step 5)
8.11.7 Set-up relating a sub screen plane view and a plane view (Step 6)
8.11.8 Set-up of floor name and AG-150A/G-50A (Step 7)
8.11.9 Set-up of icon arrange and name (Step 8)
Page
Page
Page
8.12 Watt Hour Meter Set-Up (For RS-485)
8.12.1 Setting Procedure and Restrictions
8.12.2 Watt Hour Meter Setting (Step 1)
8.12.3 Set-up for the Name and the Maximum Integrated Value of WHM (Step 2)
8.13 Measurement Meter Set-up (For PLC)
8.13.1 Setting Procedure and Restrictions
8.13.2 The number of PLC(s) (Step1)
8.13.3 PLC set-up and initial set-up (Step 2)
8.13.4 Measurement meter set-up (Step 3)
8.14 Energy Monitoring Set-up
Set Charge System options.
8.14.2 Division mode (Step 1)
Select the Division Mode or proportional division refer- ence data.
8.14.3 Relation between outdoor units and watt hour meters (Step 2)
Set the Outdoor Unit and watt hour Meter Relationship.
8.14.4 Electrical specification of outdoor units (Step 3)
Model Numbers
8.14.5 Relation between indoor units and watt hour meters (Step 4)
Set the Indoor Unit and Watt Hour Meter Relationship.
Deleting Watt Hour Meter Relationships
8.14.6 Electrical specification of indoor units (Step 5)
Set indoor unit operating capacity and power input and auxiliary heater.
Set the charge blocks.
Release a block from charge blocks.
Add charge blocks.
8.15 Charge Set-up (For RS-485) 8.15.1 Currency unit set
Selecting a Currency from the Display
Manually Setting the Currency
8.15.2 Charge set
Set the electric power rate schedule.
8.15.3 Standard charge set
Set the standard charge.
Page
Page
Set the unit price and charge time zone.
Page
Set the pattern and charge time zone
Displaying the annual charge settings
Setting the annual pattern name
Changing the pattern
Cancel the annual charge pattern
Page
Page
Set the energy saving function for the indoor units
Set blocks excluded from energy saving operation
Setting the energy saving function for the outdoor unit
Page
Concept
Page
8.17.2.1 Setting Procedures and Restrictions
Preparing to set the peak cut function
Set the peak cut WHM In the case of using PLC
In the case of using PI controller
8.17.2.3 Peak cut setting (Step 2) Monitor the peak cut details set in the AG-150A/G-50A.
Select the AG-150A/G-50A for peak cut control
Batch setting for the Whole building
Set the control start electric amount
Set the peak cut function for the indoor units
Set blocks excluded from energy saving operation
Setting the energy saving function for the outdoor unit
Finish setting the peak cut function, and send the set details to the G-50A
8.18 Night Mode Set-up 8.18.1 Setting Procedure and Restrictions
8.18.2 Night Mode Set-up (Step 1)
Page
8.19.2 System-changeover set-up (Step 1)
Page
8.20 Time Set-up
Time Change Not Allowed dialog box
New time monitor screen
Monitor button
data/time
Display of PC date/time
8.21 Monitoring and Changing the Meter Present Value
9.1 Result of Air-conditioning Charge Calculation
9. Char
y
e Data Correction and Remed
Page
9.2 Maintenance of Charge Data
9.2.1 Preparing for Charging Data Maintenance
Page
Page
Page
9.2.5 Verify Test Operation of Watt Hour Meter
9.3 Operation Amount Data Monitoring
Page
Page
9.5.1 Remedial apportioning setting screen (RS-485)
Page
Page
9.5.2 Remedy when computer HDD fails (no backup)
Page
9.5.3 Remedy when computer HDD fails (backup)
Page
Page
9.5.5 Remedy when watt hour meter fails (monitoring impossible)
Page
9.5.6 Remedy for system information setting error
9.6.1 Preparing for remedial apportionment of charges
Page
Page
Page
9.8 Maintaining the charge data by deleting the carry over amount for the unused unit prices
10. Error Code List
(1) Air-conditioning unit error codes
Page
Page
Page
Page
158
Detail of function
*1: Includes the sub-screen. *2: Refer to section 11.4.
11. Setting Check List
11.2 Test Run Check
Page
Page
11.3 Charging Test Run Check
Page
Page
Page
Page
Page
11.3.2 Proportionally Divided Power Charge (RS-485 WHM connection) Test Run Check
Page
Page
Page
Page
Page
11.3.3 Test run check of power apportionment billing (Electric amount pulse count)
Page
Page
Page
Page
Page
Page
Page
11.3.4 Charging test run operation methods
Page
184
Operation Block Group Indoor control
Block No.
Page
Page
Page
Page
Page
Page
Page
Page
Page
1. Windows Vista
Appendix 1: Checking the Windows Service Pack Version and Memory Size
Page
Page
2. Windows XP
Page
Page
3. Windows 2000
Page
1. Windows Vista
A
pp
endix 2: Auto Lo
-in Confirmation Method
2. Windows XP
3. Windows 2000
Clearing the charge comparison data when AG-150A/G-50A is replaced
Appendix 3: Correcting the Power Apportioning Bill When AG-150A/G-50A Fails or Is Replaced
Page
Procedures to shorten the charging test run (For PLC)
1. Preparation
2. Charging test run
Appendix 4: Shortening the Charging Test Run
- Charging test run check list -
Page
1. Backing up the system setting data in the Standard mode
Appendix 5: Backing Up the System Setting Data
2. Backing up the system setting data in the Wide area mod e
3. Backing up the system setting data using the backup tool
1. Preliminary precautions
Appendi x 6: Upgrading the Functions
2. Precautions for upgrading functions
3. Operation methods
212
Use the Meter Recording Form Example on the following page when using meters.
Reference: Example of form for recording meter values
1. Preliminary precautions
Appendix 7: Expanding the System
2. Precautions for expansion
3. Operation methods
Page
Page
Appendix 8: Char
in
Settin