Moen MT302E installation instructions TWO Handle TUB & Shower Valve, Measurements

Models: MT302E

1 4
Download 4 pages 26.73 Kb
Page 1
Image 1

MT302E

MODEL 72964 Series

INSTALLATION INSTRUCTIONS

THESE INSTRUCTIONS MUST BE

LEFT WITH HOMEOWNER

TWO HANDLE

TUB & SHOWER VALVE

Measurements

These are shown on the drawings. The depth measurment is critical. The center line of the supply and discharge piping should be a maximum of 3-1/16” (78mm) and a minimum of 2” (51mm) behind the finished wall surface, including tile. This is 1-1/16” (27mm) of adjustment.

Pipe, ells and nipples are not furnished with the valve.

SPOUT

CAUTION:

Always turn water off before disassembling the valve. Open both valve handles to

relieve water pressure and to insure that COMPLETE water shut-off has been accomplished.

Before turning water on during either rough-in or trim-out, make sure that cartridge retainer nuts are in place. The cartridges and retainer nuts were probably installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the handling of the valve by any number of persons the retainer nuts may not be properly installed. This should be care- fully checked at time of rough-in and trim-out. If the retainer nuts are not properly installed, water pressure could force the cartridges out of the casting. Personal injury or water damage to the premises could result.

Page 1
Image 1
Moen MT302E installation instructions TWO Handle TUB & Shower Valve, Measurements