19

4 x N570-0091 (1/4-20 X 1/2”)

3/8”(10mm)

9. Grill Head Installation

PROPANE ONLY – To avoid assembly difficulties, prior to mounting the grill head, remove zip tie holding regulator up under control panel. This was installed at the factory to protect the regulator hose during shipping and is no longer required. (Take care when removing the tie not to damage the hose). Ensure the regulator drops into the small opening, between the tank heat shield and the right side of the cabinet.

Lift grill head and place on assembled cart, lining up holes in top of side cart panels with holes in bottom of base. Fasten from inside using (4) 1/4-20 x 1/2” screws, two per side.

Two people are required for this step.

Correct Assembly

Incorrect Assembly

www.napoleongrills.com

Page 19
Image 19
Napoleon Grills LD485RB manual Correct Assembly Incorrect Assembly, Grill Head Installation