FP-RTD-122 and cFP-RTD-122 2 ni.com
Installing the FP-RTD-122The FP-RTD-122 mounts on a FieldPoint terminal base (FP-TB-x),
which provides operating power to the module. Installing the
FP-RTD-122 onto a powered terminal base does not disrupt the
operation of the bank.
To install the FP-RTD-122, refer to Figure1 and complete the
following steps:
1. Slide the terminal base key to either position X, used for any
module, or position 1, used for the FP-RTD-122 module.
2. Align the FP-RTD-122 alignment slots with the guide rails on
the terminal base.
3. Press firmly to seat the FP-RTD-122 on the terminal base.
When the module is firmly seated, the terminal base latch locks
it into place.
Figure 1. Installing the FP-RTD-122
Installing the cFP-RTD-122The cFP-RTD-122 mounts on a Compact FieldPoint backplane
(cFP-BP-x), which provides operating power to the module.
Installing the cFP-RTD-122 onto a powered backplane does not
disrupt the operation of the bank.
1 I/O Module
2Terminal Base
3 Alignment Slot
4Key
5Latch
6 Guide Rails
1
3
2
4
5
6