Chapter 2 Installation and Configuration
© National Instruments Corporation 2-7 SC-2043-SG User Manual
Bridge Completion SelectionJumpers W4–W7 and W10–W13 select half-bridge or full-bridge configuration for each channel
on the SC-2043-SG. Setting a jumper in the FB position disconnects the half-bridge completion
network from the channel and connects the CHn- screw terminal to the negative input of the
instrumentation amplifier for full-bridge signal inputs. Setting a jumper in the HB position
disconnects the CHn- screw terminal from the instrumentation amplifier and connects the half-
bridge completion network to the negative input of the instrumentation amplifier. Table 2-6
shows the jumper settings for the half-bridge completion jumpers and Table 2-7 lists their
corresponding channels.
Table 2-6. Half-Bridge Completion Jumper Settings
Jumper Description Configuration
W13W7
W10
W11
W4W5
W6 W12
FB position—Use this setting to
select full-bridge completion.
(factory setting)
FB HB
HB position—Use this setting to
select half-bridge completion.
FB HB
Table 2-7. Half-Bridge Completion Jumpers and Corresponding Channels
Channel Jumper
0
1
2
3
4
5
6
7
W7
W6
W5
W4
W13
W12
W11
W10