ND-71548 (E) CHAPTER 3
Page 49
Issue 2
INSTALLATION PROCEDURE
This NAP explains the procedure for unpacking and inspection.
Note 1: If any equipment is missing or damaged, report it to the supplier immediately.
Note 2: Save all packing materials and boxes so that they can be used to return damaged equipment to the supplier.
1. UNPACKING
NAP-200-003
Sheet 1/2
Unpacking and Inspection
START
Quantity check Check the quantity of packages received against the
Packing List.
Check for external damage Check the packaging for external damage.
Carry-In Carry the packages containing the Module Group into
the switching equipment room.
Unpacking Note 2 Module Group, Modules, and Units
Covers
Circuit Cards
ATTCON
Cables
END
CAUTION: Equipment may become damaged if
not handled properly during unpack-
ing and inspection. ATTEN TION
Contents
Static Sensitive
Handling
Precautions Required