ND-71548 (E) CHAPTER 3
Page 47
Issue 2
INSTALLATION PROCEDURE
3. WHEN SECURING PBX WITH FLOOR ELEVATIONS
Figure 002-5 Example of Elevation
NAP-200-002
Sheet 7/8
Marking, Leveling, and Drilling
START
Installing the Floor Elevation Secure the Floor Elevation on the concrete floor.
(See Figure 002-5.)
Marking Mark the locations of the anchor bolt holes for the Base Unit.
(See Figure 002-1.)
Drilling Drill holes in the locations.
Cutting of Free-Access Floor Cut the Free-Access Floor with a jigsaw. (See Figure 002-2.)
END
HOLE FOR SECURING
BASEU
CONCRETE FLOOR
520
(1’8.47”)
410
(1’4.14”)
ANCHOR BOLT
ELEVATION