Manuals
/
NEC
/
Computer Equipment
/
Server
NEC
5800/320Fd manual NEC Corporation of America
Models:
5800/320Fd
1
1
26
26
Download
26 pages
31.46 Kb
1
2
3
4
5
6
7
8
<
>
Install
Dimension
Page 1
Image 1
Read Me First: Unpacking Express5800/320Fd System Cabinets
NEC Corporation of America
456-01741-000
Page 2
Page 1
Image 1
Page 2
Contents
NEC Corporation of America
Page
Contents
Page
Packaged Cabinet
Introduction
W A R N I N G
C A U T I O N
Tie-down
Figure 1. Cabinet Packaged for Shipping
Ramp
Pallet
C A U T I O N
Before Unpacking the Cabinet
80 in
Figure 2. Dimensions of a Packaged 38U Cabinet
38U Cabinet
5 in
Figure 3. Dimensions of a Packaged 24U Cabinet
W A R N I N G
Moving the Cabinet to the Installation Site
C A U T I O N
To unpack the cabinet
Unpacking and Checking the Cabinet
C A U T I O N
Removing the Packing Materials
Tools Needed to Unpack the Cabinet
W A R N I N G
W A R N I N G
hsys035
Figure 5. Cutting the Exterior Shipping Straps
C A U T I O N
6. Remove the plastic wrap encasing the cabinet
Figure 6. Removing the Packing Material
hsys036
hsys037
Figure 7. Removing the Interior Shipping Straps
hsys038
Figure 8. Wooden-RestraintBlocks
hsys039
Figure 9. Inserting the Lever Bar
msys101
Figure 10. Tilting the Cabinet
msys102
Removing the Cabinet from the Pallet
Figure 12. Position the Pallet Ramp
W A R N I N G
msys105
Checking the Cabinet and Systems
Verifying the Express5800/320Fd Serial Number
Table 1. Stabilization Guidelines
Stabilizing the Systems
What Happens Next?
Disposing of Shipping Materials
System Documentation
C A U T I O N
Online support from NEC Technical Support. You
Getting Help