Unpack the Box and Verify the
1 Contents
Fast Ethernet Switch FS605 v3/FS608 v3
Stand
Installation guide, |
|
warranty/registration card |
|
and support |
|
information card | Power adapter |
When you open the box, verify that you received everything. The package includes:
•
•AC power adapter
•FS605 v3/FS608 v3 Installation Guide (this document)
•Warranty and support information card
•Vertical stand
If you don’t have everything listed above, see the support information card for contact information. If you’re missing the Technical Support information card itself, get contact information at www.NETGEAR.com in the Customer Service area.
2 Prepare to Install the Switch
Decide where you want to place the switch. Find a flat horizontal surface — such as a table, desk or shelf.
Make sure the selected location is:
•Not in direct sunlight or near a heater or heating vent.
•Not cluttered or crowded. There should be at least 2 inches (5 cm) of clear space on all sides of the switch.
•Well ventilated (especially if it is in a closet).
Also, you’ll need one Category 5 (Cat 5) Ethernet cable with