Unit serial number:

_____________________________________________

The unit complies with all technical specifications and has passed the inspection.

Date of production:

_____________________________________________

Quality Inspector’s signature:

_____________________________________________

Quality Assurance Seal

__________________________________________

39

Page 39
Image 39
Newcon Optik NVS-33 operation manual