INSTALLATION IN
EXISTING CONSTRUCTION
In an existing, finished building, installation of the Heat-
PLANNING
Review “INSTALLATION IN NEW CONSTRUCTION” and follow all instructions that apply.
CAUTION: Check the area above the planned location to make sure that:
(1)Ducting can be installed.
(2)Wiring can be run to the planned location.
(3)No wiring or other obstructions might interfere with the installation.
INSTALLATION
1.The housing must be mounted between ceiling joists.
2.Refer to Figure 10. Mark ceiling for cutout. Cutout dimensions: 141⁄8" long x 97⁄8" wide. Make cutout in ceiling.
3.Follow steps under “PREPARATION” page 1.
4.From above, lower housing into the cutout and secure hanger brackets. Install duct collar, connect duct, and run wiring through box connectors.
5.From below, adjust housing so that it is flush with the finished ceiling.
6.Form below, make wiring connections as shown in figure 6.
7.Replace junction box cover.
8.Insert heater, ventilator, light, and night light plugs into proper receptacles.
9.install grille, reflector and lens.
WHITE | HEAT |
| |
| VENT |
| FIGURE 8 |
(LENS DETACHED | LENS |
IN DRAWING FOR |
|
ILLUSTRATIVE |
|
PURPOSES) |
|
| FIGURE 9 |
141⁄8" |
97⁄8" |
FIGURE 10 |