INSTALLATION
OPTION #1 - UNDER CABINET ACCESS TO PIPING FROM BELOW
Refer to Figure 2
1.Select a location under cabinet for VacPan™ (6) so that new fittings can be connected to existing pipe. Drill small reference hole under location of VacPan™ to determine position in basement or crawl space.
2.Using a hole saw, cut access hole (3) in floor under cabinet. Position access hole (3) so that final fittings (7) can be installed by reaching through access hole (3).
3.Cut 6 3/4" long slot along kick (4) of cabinet.
4.Make terminal connections (5).
5.Slide VacPan™ (6) into slot and secure using #6 painted wood screws provided.
6.Reach through access hole (3) and make final fitting connections (7).
IF ACCESS CANNOT BE MADE FROM BELOW
1.
2.Provide slack in low voltage lines for future connection.
3.Once cabinets are installed, cut access hole (13) and cover with cover plate (14). Reach through and make final connections as per previous installation.
7 FINAL FITTING | 13 COVER ACCESS PLATE | |
CONNECTIONS | ||
(IF REQUIRED ACCESS CANNOT | ||
| ||
CABINET | BE MADE FROM BELOW) | |
| ||
| 8 HATCHED AREA | |
4 KICKSPACE | REPRESENTS | |
PIPING | ||
| ||
| ALLOW 1/2" FLEX IN PIPE |
6VACPAN™
SUBFLOOR | 5 TERMINAL | 3 ACCESS HOLE IN SUBFLOORING |
| CONNECTIONS | |
|
| UNDER CABINET |
| JOIST SPACE |
|
|
| TO CENTRAL VAC |
IF CEILING IS INSTALLED - PROVIDE COVER PLATE IN BOTTOM OF CABINET TO MAKE FITTING CONNECTIONS. (IF CEILING IS NOT INSTALLED, FINAL FITTING
CONNECTIONS CAN BE MADE THROUGH ACCESS HOLE INFIGURE 2 SUBFLOOR.