P3 International E9310 manual Preparing for operation, Open the housing, Inserting the batteries

Models: E9310

1 12
Download 12 pages 59.2 Kb
Page 6
Image 6
5. Preparing for operation

5. Preparing for operation

5.1. Open the housing

-Rotate the unit and unscrew the 6 screws (see below)

-Lift up the upper part carefully.

5.2. Inserting the batteries

-The unit is operated with 3 x 1,5 V AA batteries. Use alkaline batteries for longer life and better protection against leaking.

-Insert the three batteries into the battery holder with right polarity as shown in the battery holder.

-If you want to make settings (addresses or measuring unit), go to the next chapter.

-Finally, close the housing. Be sure the temperature sensor is placed in the correct position in the housing and most importantly that the neopre- ne seal ring is aligned properly before you close the housing and tighten the screws. Tighten the screws carefully in a diagonal sequence.

5.3.Setting address and measuring units Display

Screws

Batteries

Sensor

Eye for fixing on the ground



Page 6
Image 6
P3 International E9310 manual Preparing for operation, Open the housing, Inserting the batteries