PAN-PUNCH110 Tower System

© Panduit Corp. 2007

INSTALLATION INSTRUCTIONS PN79G

CABLE REQUIREMENT: Terminates most 22-26 AWG solid or stranded

IWC wire with a .050" (1.27mm) max. o.d., either PVC or Plenum rated.

NOTE: 300 PAIR TOWER SHOWN. INSTRUCTIONS ALSO APPLY TO THE 900 PAIR TOWER.

1. Mount tower to wall using #12 wood screws (not provided) or

2. Route cable bundle into tower and fan out individual cables into

equivalent. Some applications will require different mounting

their appropriate positions through the cutouts provided along the

hardware. Ensure that the bottom of the tower is at least 8" from

tower leaving 12" to 18" of slack. Each cutout accommodates up

the floor to provide space for horizontal cable manager trough.

to 25 pair. Use cable ties to secure bundle to raised tabs on back

 

of tower.

3. Position base over slots in tower and secure with two #12

4. Install jumper troughs between bases with two #12 sheet metal

sheet metal screws (supplied). Place conductors into index

screws (supplied).

strip and install connecting blocks as per instruction sheet

 

PN51* (provided).

 

SCREW HERE

SCREW HERE

* Denotes instruction sheet revision letter.

For Technical Support: www.panduit.com/resources/install_maintain.asp

Page 1 of 2

Page 1
Image 1
Panduit installation instructions PAN-PUNCH110 Tower System, Installation Instructions PN79G, Screw Here