10 3/8 X 3”

7

2

7

3

9

FIGURE 3

STEP 3:

LOOSELY assemble the CHIN BAR (2) to the VKR SIDES (3) using two 3/8 X 3” BOLTS (10), four 3/8” FLAT WASHERS (7), and two 3/8” LOCK NUTS (9).

SECURELY tigten all connections made up to this point.

7

Page 7
Image 7
ParaBody 813 manual Step