10 3/8 X 3” |
7 |
2 |
7 |
3 |
9 |
FIGURE 3 |
STEP 3:
•LOOSELY assemble the CHIN BAR (2) to the VKR SIDES (3) using two 3/8 X 3” BOLTS (10), four 3/8” FLAT WASHERS (7), and two 3/8” LOCK NUTS (9).
•SECURELY tigten all connections made up to this point.
7
10 3/8 X 3” |
7 |
2 |
7 |
3 |
9 |
FIGURE 3 |
•LOOSELY assemble the CHIN BAR (2) to the VKR SIDES (3) using two 3/8 X 3” BOLTS (10), four 3/8” FLAT WASHERS (7), and two 3/8” LOCK NUTS (9).
•SECURELY tigten all connections made up to this point.
7