STEP22
Wrapthe PECDECCABLE(24) around one
(23)and assemble the PULLEYto the PULLEYBRACKET (1 l) using one 3/g X 2" BOLT(29) and one 3/8" LOCKNUT
(36)as shownin HGUR~22.
3
FIGURE 22
FIGURE 23
STEP23:
¯Insert each end of PECCABLE(24) into the bushings on the camsof the LEFT(15) &RIGHT(].4) PECAI~IS, then drape
CABLEover the PULLEYSassembled to the CENTERPULLEYBRACKET(16). See FIGURE23 & 893103 CABLEDIA- GRAMon PAGE12.
¯After CABLE(18) has been routed over the PULLEYSon the CENTERPULLEYBRACKET(16), position CABLERET.A~N- INGCLIPS(56) at a ° angle over th e PULLEYS and SECURELYghtenti .
o | I | [ ! I ! |
I | 16 | |
|
|