If youhaveinstalledsecondweightstack,goto

Figure5.

If youhavenotpurchasedthesecondweight stack,pleasecamp]erethefolJowingstepsbefore proceedingtoF~gure5.

1.Removetheblankshroudfromtherearofthe Factor625.

2.Removetherotarycablefromtheunitand alsotheassadatedshockcord.

3.LoadtheLegPressCableintothe D-RingthepositiontheRotaryCablewas removedfromRemove.theelasticshockcord fromtheRotaryCableandattachtotheLeg PressCableasshown(sameroutingofelastic cordasonRotaryCable).

1.Attachtwo(2)4V2w/lClev;sPulleystothe '~

BaseFrameandone{I)marelongcable t retainingclipwithexistinghardwareafter removingone(1)41/2"w/2"ClevisPulley previouslyinstalled(See.Detail"A")Route. cableasshownThe.pulleyattherightside(as~k~.

youfacethebackoftheunit)hasLegPress cablefromD-ringroutedunderandbackupto pulleyshowninFigure2.

ELASTICSHOCKCORD

LEGPRESSCABLE (PB3236-01)

-- D:RING

'--:~ ~ --~'-

~

LEGPRESSC.ABLE

FRO,~D-RING

PULLEY-PL2

LONG

R~AININGCUP-2PL

. PULL~ -2 PL

SIDE VIEW

Page 3
Image 3
ParaBody Factor 625 manual If youhaveinstalledsecondweightstack,goto, Attachtwo24V2w/lClevsPulleystothe ~, ~ ~ --~