5.0 POWER-UP

To apply power to the Model 1194, first be sure that the unit is connected to the appropriate power source. Then do the following:

1.Set front panel switches to the center position

2.Plug the provided AC or DC power into the Model 1194.

3.Set the ON/OFF power switch (see Figure 8 on page 16) to ON. After the local and remote Model 1194s are powered up, a synchro- nization process will occur to establish a link. The synchronization process should take approximately 5 seconds. If one of the Model 1194s loses power (for example, during a lightning storm), the local and remote units will re-synchronize before they can resume data transmission.

17