CONTENTS
Section |
| Page | |
1.0 | GENERAL | 3 | |
| 1.1 | IMPORTANT SAFEGUARDS AND WARNINGS | 3 |
2.0 | DESCRIPTION | 4 | |
| 2.1 | MODELS | 4 |
3.0 | INSTALLATION | 5 | |
| 3.1 | CONDUCTOR AND CABLE REQUIREMENTS | 5 |
|
| 3.1.1Recommended Mounts | 5 |
|
| 3.1.2Recommended Cables | 5 |
| 3.2 | CONNECTOR ASSEMBLY | 9 |
| 3.3 | MOUNTING | 11 |
| 3.4 | DOME INSTALLATION | 12 |
4.0 | EXPLODED ASSEMBLY DIAGRAM | 13 | |
5.0 | ADJUSTMENTS | 15 | |
6.0 | MAINTENANCE | 16 | |
7.0 | SPECIFICATIONS | 17 | |
8.0 | WARRANTY AND RETURN INFORMATION | 20 |
LIST OF ILLUSTRATIONS
Figure |
| Page |
1 | SS20/SS22/SS2000/SS2002 Dimension Drawing | 4 |
2 | 6 | |
3 | 7 | |
4 | 8 | |
5 | Connector Assembly | 9 |
6 | Mating Cable Assembly Configuration | 10 |
7 | Mating Cable Assembly Configuration (PP Versions) | 10 |
8 | Mounting Configurations | 11 |
9 | SS2000/SS2002 Exploded Assembly Diagram | 14 |
10 | Limit Stop Locations | 15 |
11 | Tilt Limit Stop Modifications | 15 |
LIST OF TABLES
Table |
| Page |
A | SS2000/SS2002 Exploded Assembly Diagram | ................................ 13 |
REVISION HISTORY
Manual # | Date | Comments |
10/94 | Wire colors revised on figures | |
|
| Figure 2; Pins 8 & 23 - Figures 3 and 4; Pins 8, 11, 12, |
|
| 13 - Figures 6 and 7.) |
7/96 | Revised to include new models SS22 and | |
| 8/96 | Revised Section 5.0, Mechanical Parts List, regarding |
|
| lower dome part numbers and quantities of velcro. |
| 7/97 | Corrected wiring for pins 19 and 27 in Figure 7 per ECO |
|
| |
| 2/98 | Revised Section 6.0, Maintenance. Changed manual to |
|
| new style. |
2 | Pelco Manual |